Existing wall framing was in place, and we constructed a new partition wall to separate the shower area. From there, the entire space was built out, including plumbing, electrical, and ceiling installation.

Scope of work included:

  • Construction of a new shower partition wall
  • Full plumbing installation and drainage setup
  • Electrical rough-in, lighting, and controls
  • Installation of a new ceiling with recessed lighting
  • Electric heated floor system
  • Schluter waterproofing system in all wet areas
  • Walk-in shower with custom tile work and built-in niche
  • Installation of a double vanity and fixtures
  • Clean, modern tile finishes throughout

The result is a fully functional, well-built bathroom with a clean, modern look and long-term durability.

Built right from the inside out — clean, solid, and reliable.
Project #5
This project was a full bathroom build completed in 4 weeks, starting from an unfinished basement space.
Basement Bathroom Build — Kelowna, BC